Truck & Van Workshop Fit-Out

Truck & Van Workshop Fit-Out

Truck & Van Workshop Fit-Out

Complete electrical fit-out across two industrial units for a head office and flagship vehicle workshops.

Operational truck workshop with vehicle inspection bays, trucks and overhead lighting.

The workshop in operation, showing the scale of the premises and overhead lighting.

End-user operation

Mercedes truck and van workshops

Location

Knowsley, Liverpool

Sector

Commercial & industrial

Scope

Electrical fit-out across two large industrial units

The project

Warwickshire Electrical delivered the electrical fit-out across two large industrial units in Knowsley, Liverpool, taken on for a Mercedes truck and van operation’s head office and flagship workshops.

The project combined substantial workshop equipment supplies with new distribution boards, LED lighting, Cat6 cabling, air-conditioning supplies and lighting for mezzanine and storage areas.

Delivery was planned around a strict relocation programme, ready for the customer’s move from its existing premises.

Scope of work

Scope of work

Scope of work

Workshop equipment supplies

Dedicated electrical supplies for the truck and van workshop equipment, including substantial power requirements.

Distribution and capacity

New distribution boards and upgraded distribution-board supplies to accommodate the new installation’s maximum demand.

LED lighting

New LED lighting throughout the workshop and office areas.

Cat6 cabling

Cat6 data cabling across the new premises.

Air-conditioning supplies

Electrical supplies for the air-conditioning equipment.

Mezzanine and storage areas

Lighting installations serving the new mezzanine and storage areas.

Matching the supplies to the workshop demand

Matching the supplies to the workshop demand

Matching the supplies to the workshop demand

The workshop equipment introduced substantial electrical loads. Distribution-board supplies needed upgrading to provide sufficient capacity for the new maximum demand.

This made the electrical distribution a central part of the fit-out, alongside the individual supplies serving the workshop equipment.

Distribution board with cover removed, showing circuit wiring and internal electrical connections.

Distribution-board installation detail, photographed with the cover removed.

A programme built around the move

A programme built around the move

A programme built around the move

The customer needed the new premises ready for its move from the existing unit.

Working away from our Coventry and Warwickshire base, we delivered the installation to a strict programme linked to that relocation, covering both the workshop requirements and the supporting office and storage spaces.

Open-plan office with desks, suspended ceiling and illuminated LED panels.

Office accommodation with new LED lighting.

Storage shelving and a mezzanine staircase with overhead lighting.

Lighting serving the mezzanine and storage areas.

Industrial unit during fit-out with an unfinished mezzanine, materials and site equipment.

The industrial space during the fit-out.

Workshop power and office infrastructure in one installation

Workshop power and office infrastructure in one installation

The completed electrical fit-out brought together equipment power, upgraded distribution, lighting and data infrastructure across the two units, supporting their use as head-office and workshop premises.

Planning a workshop or commercial fit-out?

Planning a workshop or commercial fit-out?

Planning a workshop or commercial fit-out?

Talk to us about your equipment supplies, electrical infrastructure and project programme.